New builds
New Construction Wiring in Duvall
On a new build the electrical is judged by whether it holds up the schedule. Ours does not.
The whole electrical scope, one crew
A ground-up build gives you something a remodel never does: the chance to put the electrical exactly where it should be, before anything constrains it. Switch positions that suit how the rooms will be used, lighting planned with the ceiling, circuits sized for the equipment the house is actually getting. We take the whole scope — temporary power, service entrance, rough-in, inspections, trim — so there is one number, one crew and one set of dates for your builder to work to.
What the job includes
Temporary power and the service entrance
Power on site when the trades need it, and the permanent service established in coordination with the utility.
A full rough-in
Every circuit run, boxes set, and the lighting layout walked with you before anything is covered.
Inspection management
Rough and final inspections filed and attended, timed so the build does not sit waiting on us.
Final trim and handover
Devices, plates and fixtures fitted, everything tested, panel labelled, documentation handed over.
How we fit into a build
Plans at permit stage
The best moment to involve us. Lighting and circuit decisions made now cost nothing to change.
Framing complete
Rough-in slots in here. We need the window between framing and insulation, and we hold the dates we give.
Multiple trades on site
We work to the construction schedule, not our own, and tell your builder directly when something slips.
An owner-builder project
We are used to working with owners who are managing their own build, and we will flag the electrical decisions you need to make early.
How the work runs
Price the plans
A full scope and a fixed number from the drawings rather than a per-point estimate.
Temporary and service
Site power early, permanent service coordinated with the utility.
Rough-in and inspect
Run, walked with you, then inspected before close-up.
Trim and hand over
Fixtures and devices at the end, tested, labelled and documented.
Questions about this work
Do you work with our general contractor?
Yes, and most of our new-build work comes that way. Your builder gets dates and a direct number, not a dispatcher.
Can we change the lighting layout after rough-in?
Small changes, sometimes. Anything structural to the layout is far cheaper before rough-in, which is why we walk the plan with you first — it is the step that prevents most change orders.
Do you handle the utility side?
We coordinate it. The utility has its own process and timelines, and knowing where you are in that queue is half the battle on a new build.
Price the electrical on your build
Send the drawings or call. The quote and the planning conversation are free.